SmugMug
Home | Login | Help |
 
|
|View Cart
AlexAndChristine  > Bicycles > Projects > Cycle Truck
Gallery pages:  <  1  2  3  4  5  6  >  >>
< 12 of 66 >
AlexAndChristine > The head tube and cargo tube have been mitered and are mounted on the front triangle fixture along with the donor frame.
AlexAndChristine > Head tube/cargo tube junction.
AlexAndChristine > Head tube/cargo tube sub assembly.
AlexAndChristine > The frame is brazed together.
AlexAndChristine > Head tube/cargo tube/downtube junction.  There is a lot going on here.
AlexAndChristine > Downtube/BB junction.
AlexAndChristine > Cargo tube/seat tube junction.  I added a gusset to spread the load and because my cargo tube was 1mm short and I didn't want to remiter the top tube.
AlexAndChristine > Alistair gives the bike a spin.  This cargo box is temporary until I build a rack.
AlexAndChristine > From a ride to West Seattle
Head tube/cargo tube sub assembly.
 > Head tube/cargo tube sub assembly.
Head tube/cargo tube sub assembly.
Camera: Panasonic (Dmc-lx2) |
More details: exif |
Original size: 1600px x 590px |
Current: 400px x 148px |
Other sizes: Small • M • L • O • save photo |
Share photo: links, forums, blogs |
Keywords: bicycle cargo bike brazing alignment table frame fixture frame jig
Gallery pages:  <  1  2  3  4  5  6  >  >>
< 12 of 66 >

Comments

| hide gallery comments |

New comment: Requires approval

Name: Email: Link:
Connect  Connect with Facebook


Comment on: | Rating: stars
To foil spammers, enter this code: copy this text in this box: Code unreadable?



Powered by SmugMug | Login | Shopping Cart | Help | Portions © 2009 SmugMug, Inc.
Show FeedsAvailable Feeds | What are feeds?
Gallery Photos:
Atom FeedAtom | RSS FeedRSS